100,000lbs of Fragile
Problem:
To service market demand on it’s China plant our client decided to temporarily relocate a large stamping press for a finite production run.
To minimize disassembly is the US and installation time & cost in China it was decided that the press would shipped in an almost fully-assembled fashion. This presented challenges to the packaging design due to fragile hydraulic piping, power and control wiring being left on the machine for shipment.
As a result a unique, one-of-a-kind crate was designed that accounted for the cargo weight and allowed access to cast-in lifting points whilst still protecting those delicate components that, if damaged, would add cost and hinder the implementation of the production run in China.
Download the case study to see our solution.

Solutions

Markets

Support

Dockside
Let's Work Together
Dockside: The Measurable Difference
844-395-7447
1 Immigration St
Charleston, SC 29403
912 Commerce Cir
Hanahan, SC
4756 U.S. Highway 78
Saint George, SC 29477
DOCKSIDE HOUSTON
844-395-7447
7449 E Orem Dr
Houston, TX 77075