CASE STUDIES

 

PROVING PERFORMANCE PERFECTION IS POSSIBLE

DOCKSIDE – THE MEASURABLE DIFFERENCE

Power and Energy

Powering results & Cost Reductions

Our client knew they had problems, but weren’t really sure how to address them. Their $30m + gas turbine power plant engines were rusting in storage and transit before ever reaching the installation site.
Read More >

Bigger is Better

Our client had built the first of their newest product, the world’s largest and most efficient gas turbine engine, a 500,000lbs behemoth that cost $1 bn to develop.

Read More >

See Dockside Deliver:

Charleston, SC

1301-B Charleston Regional Parkway
Charleston, SC 29492
843-856-2260 | MAP >

Savannah, GA

190 Gulfstream Road
Savannah, GA 31408
912-662-7180 | MAP >

Coeymans, NY

167 Coeymans Industrial Park Lane
Coeymans, NY 12045
518-300-4468 | MAP >